Showing posts with label Region VI. Show all posts
Showing posts with label Region VI. Show all posts

Restoration of Molo Church

Project: Restoration of Molo Church
Location: Molo, Iloilo
Cultural property owner: Archdiocese of Jaro
GAA Budget: P3,000,000.00
Fiscal year: 2022
Date started: 2022
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: To be determined
Project description:

The project focuses on the cleaning of the stone walls, repointing of masonry units, consolidation of wall cracks, and repair of damaged areas of the bell tower. To rehabilitate some parts of the church, the NHCP will repaint the interior of the church and refurbish the grille works.

Restoration and Rehabilitation of Iloilo Customs Building (Phase I)

Project: Restoration and Rehabilitation of Iloilo Customs Building (Phase I) 
Location: Iloilo City
Cultural property owner: Bureau of Customs
GAA Budget: P30,000,000.00
Fiscal year: 2021
Date started: 2021
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: JS Lim Construction
Project description:

The Customs Building in Iloilo also called “Aduana” is designed by renowned Filipino Architect Tomas B. Mapua and was built in 1916 during the American colonial period. It is the second biggest Customs House after that of Manila’s which symbolized the importance of Iloilo City with trade and commerce in the Visayas region, most notably on trans-shipment of sugar. Today, the Aduana still houses the offices of the Bureau of Customs and the Philippine Postal Corporation.

The architecture of the Iloilo Customs Building is neoclassical like the Immigration Building in Manila, which is characterized by a tall square tower at the center of the building. It is recognized as one of the most beautiful Customs Building ever built in the Philippines. 

The NHCP proposes to restore the Iloilo Customs Building and adaptively reusing it as a museum. Major interior works include dismantling of existing partitions, replacement of damaged/missing ornamental moldings, installation of new floorings, replacement of doors and windows, general repainting, plumbing, electrical and mechanical works. Site development includes the provision of new concrete pavers, landscaping works and relocation of existing electrical posts and cables along the side facing the Iloilo River.

Photos:
Facade of the Customs House Building



Restoration, Improvement and Renovation of Jaro Plaza and Belfry

Project: Restoration, Improvement and Renovation of Jaro Plaza and Belfry
Location: Jaro, Iloilo City
Cultural property owner: Bureau of Customs
GAA Budget: P35,000,000.00
Fiscal year: 2021
Date started: 2021
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: 401 Development Corp.
Description:

The aim of the project is to restore the belfry back to its prewar appearance and redevelop historic structures inside the plaza.

Photos:
Bandstand

Belfry

Lopez Jaena Monument



Rehabilitation, Improvement and Renovation of Molo Plaza

Project: Rehabilitation, Improvement and Renovation of Molo Plaza 
Location: Molo, Iloilo City
Cultural property owner: Bureau of Customs
GAA Budget: P25,000,000.00
Fiscal year: 2021
Date started: 2021
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: 401 Development Corp.
Description:

The aim of the project is to redevelop historic structures inside the plaza and create a dedicated plaza showcasing the architectural wonder of the facade of the Molo Church.

Photos:





Curatorial Development of Sta. Barbara Convent

Project: Curatorial Development of Sta. Barbara Convent
Location: Sta. Barbara Parish, Sta. Barbara, Iloilo
Cultural property owner: Archdiocese of Jaro
GAA Budget: P8,000,000.00
Fiscal year: 2016
Date started: The project was bidded out in 2016
Date completed: The project did not push through since the parish do not have a relocation site in exchange for the adaptive reuse of the convent into a museum. The project was cancelled.
Implementing agency: National Historical Commission of the Philippines
Contractor: None
Project description:

Given the vast cultural property collection of the Archdiocese of Jaro, the NHCP proposed to convert the old convent of Sta. Barbara Church into an ecclesiastical museum. The two storey "bahay na bato" convent attached to the historic church was restored by NHCP in 2014-2015. The curatorial plan was to narrate the historical development of churches in the province through its old artefacts, under the care of the archdiocese. 

Declared as a national historical landmark, the church and convent was used as a headquarters of "Ejercito Libertador," a revolutionary government led by Iloilo's local hero, Martin Delgado.

Photos:
The old convent building

Interior of the convent to be adaptively reused as a museum

The balcony of the convent
 

Construction of Nazaria Lagos Monument

Project: Construction of Nazaria Lagos Monument
Location: Dueñas, Iloilo
Cultural property owner: Municipal Government of Dueñas
GAA Budget: P2,000,000.00
Fiscal year: 2018
Date of formal turnover: 13 February 2019
Implementing agency: National Historical Commission of the Philippines
Artist: Julie Lluch
Project description:

The National Historical Commission of the Philippines is mandated to promote, preserve and disseminate information regarding historical events, dates, places and personages.  As part of its mandate to commemorate eminent Filipinos, the NHCP proposed a monument to Nazaria Lagos, a woman leader from Dueñas who helped in the many battles against Spaniards and Americans.  Her exemplary life has become an exceptional model to the local community of Dueñas and the Filipino nation.

Project documentation:
The monument and pedestal dedicated for Nazaria Lagos
Turnover ceremonies held on 13 February 2019.
Turnover ceremonies held on 13 February 2019.

Restoration of Bahay na Bato in Antique (Phase 2)

Project: Restoration of Bahay na Bato in Antique (Phase 2)
Location: Gobierno Street, San Jose de Buenavista, Antique
Cultural property owner: Provincial Government of Antique
GAA Budget: P15,000,000.00
Fiscal year: 2019
Project duration: 240 calendar days
Date started: No data
Target date of completion: No data
Date completed: 2020
Implementing agency: National Historical Commission of the Philippines
Contractor: R.A. Lacanlale Const.
Project description:

This second phase of the conservation project is focused on the repair, restoration of the interior spaces of the house.

Scope of work of the project:

1.0    MOBILIZATION AND SITE PREPARATION
   
1.1.    Temporary/ storage facilities;
1.2.    Rental/provision of scaffolding and board-up;
1.3.    Photo documentation before, during and after the project implementation
1.4.    Construction safety and Health requirements;

1.4.1.    Provision of Personal Protective Equipment (PPE);
1.4.2.    Construction signage;
1.4.3.    Installation of dropnets

1.5.    Preparation of as-built plans;
1.6.    Light, power and water service connection;

2.0    RESTORATION WORK

2.1.    Restoration and consolidation of unreinforced masonry walls

2.1.1.    Consolidation of cracks on walls, re-pointing of masonry joints and gaps
2.1.2.    Provision and re-installation of lost/ missing coral blocks, mouldings and cornices
2.1.3.    Application of damp proofing/water repellent solution on masonry walls

3.0    CARPENTRY WORK

3.1.    Restoration and provision of new doors and windows
3.2.    Provision of new ceiling framing and ceiling boards
3.3.    Restoration and replacement of wooden floor joists, bridging, and planks
3.4.    Restoration and re-construction of wooden walls and ventanillas at volada
3.5.    Restoration and rehabilitation of wooden stairs
3.6.    Fabrication and installation of wood cladding on structural columns
3.7.    Provision of wooden roof brackets

4.0    PROVISION OF CURATOR’S OFFICE AT SECOND FLOOR

4.1.    Provision of concrete slab
4.2.    Plumbing and sanitary work
4.3.    Provision of tiles at the toilet (floor and walls)

5.0    FINISHING WORK

5.1.    Provision of cement tiles at the ground floor (for all rooms except the hallways)
5.2.    Varnishing and painting work (Includes all wooden and concrete surfaces)

6.0    ELECTRICAL WORK

6.1.    Provision of new electrical system
6.2.    Provision of air conditioning units

7.0    COMPREHENSIVE TERMITE TREATMENT

8.0    SITE DEVELOPMENT WORK

8.1.    Provision of new public (PWD) toilet (includes architectural,civil, plumbing, lighting and finishing work)
8.2.    Landscaping work
8.3.    Provision of outdoor lamps/lights

9.0    CLEANING AND CLEARING OF SITE

Project documentation:

Perspective drawing of the proposed restoration project

Perspective of the facade of the proposed restoration project


Before restoration

After restoration


Fabrication of Tableau of Aklan Katipuneros depicting the struggles and triumph of the Katipunan revolutionary heroes of Aklan

Project: Fabrication of Tableau of Aklan Katipuneros depicting the struggles and triumph of the Katipunan revolutionary heroes of Aklan
Location: Plaza of the Aklan Provincial Capitol, Kalibo, Aklan
Cultural property owner: Provincial Government of Aklan
GAA Budget: P6,000,000.00
Fiscal year: 2016
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippines
Contractor/Artist: Juan Sajid Imao
Project documentation:








Construction of Teresa Magbanua Monument

Project: Construction of Teresa Magbanua Monument
Location: Pototan, Iloilo
Cultural property owner: Municipal Government of Pototan
GAA Budget: P2,000,000.00
Fiscal year: 2018
Date of formal turnover: 13 February 2019
Implementing agency: National Historical Commission of the Philippines
Artist: Estatuarte Sculptures and Artworks / Abdulmati "TOYM" De Leon Imao, Jr.
Project description:

The National Historical Commission of the Philippines is mandated to promote, preserve and disseminate information regarding historical events, dates, places and personages.  As part of its mandate to commemorate eminent Filipinos, the NHCP proposed a monument to Teresa Magbanua, a woman leader of the Visayas who fought many battles against Spaniards and Americans.  Her exemplary life has become an exceptional model to the local community of Pototan and the Filipino nation.

Project documentation:

The design depicts Teresa Magbanua riding a horse on a field of grass.  It is not in a running pose, but a calm and dignified walk on the grass as she rallies her troops.  The depiction of the wind (as reflected on the sway of the grass) is behind the rider, the symbolism being the odds are in favor of Filipino fighters.  This also connotes a strategic advantage.  She holds a pistol on right hand and hold on to reins, which shall be period-correct and more detailed.

The artist will be using a combination of two methods of brass fabrication: cast bronze and pounded brass.  Both are classical materials for monument building that can last for generations.  Fiber-reinforced concrete will also be used. For the Teresa Magbanua figure, cast bronze in antiqued brown/copper patina, waxed and coated with 8 coats of polyurethane for weather sealing will be used. 

For the Pedestal:
Following the architectural style of the municipal building and the park in front of it, the pedestal will be made of simple geometric art deco lines and of concrete finished in white with natural stone accents to match the surrounding structures.  This will constructed on site.
For Blades of Grass:
At the base of the monument are blades of grass (antiqued green or verdigris with eight coats of polyurethane) made up of pounded brass with FRC reinforcement for the minor details to be weld with other components of the structure

The completed monument
The completed statue of Teresa Magbanua
The formal turnover ceremonies held on 13 February 2019.
Profile of the statue and pedestal, as sketched by the sculptor TOYM Imao



Restoration and Curatorial Development of the Old COA Building (Ynchausti y Compania)

Project: Restoration and Curatorial Development of the Old COA Building (Ynchausti y Compania Building)
Location: Iloilo City
Cultural property owner: National Historical Commission of the Philippines
Grant from the Commission on Audit (2015): P40,000,000.00
GAA Budget (2016): P20,000,000.00
GAA Budget (2017): P26,000,000.00
Duration of implementation: 2015-2019
Date of formal turnover: 11 February 2019
Implementing agency: National Historical Commission of the Philippines
Contractor: J.S. Lim Construction and Trading (Structural); Red Root (Curatorial)

Project description:

In 2015, the Commission of Audit (COA) donated this cultural property to the National Historical Commission of the Philippines (NHCP) with the aim of converting it into a history museum. There are three buildings inside the complex. The main building, annex building (former staff house), and water reservoir were built of masonry bricks and hardwood. Each one has been adaptively reused for museum operations.

The massive main building, a large-scale bahay na bato, was the trading house of the Ynchausti y Compania in the late 19th century. It's more recent owner, the COA, has made several additions and renovations in the building through the years. Nevertheless, its salient architectural features were still recognizable and preserved. The restoration program was to remove all incompatible additions on the building and return its early twentieth century appearance.

The restoration team reconstructed the lost volada space, which an eclectic combination of capiz (shell) sliding windows, wooden panels and French-type doors with colored glass. The NHCP replaced the recently-added ceramic tiles at the ground floor with colored cement tiles, popularly known as baldoza and Machuca tiles, to harmonize with the period look of the building. With restored architectural spaces like the sun room, azotea, and balcony at the back of the house, its American-period look was achieved.

Initially, the NHCP planned to restore the original location of one of its stairways which was moved by COA in the 1980s. Due to structural problems, the plan was not realized. The existing stairs inside the building, which was originally symmetrical to the one outside, was deemed adequate for the new use of the building. Hence, the museum flow plan was adjusted to utilize the existing stairs and open-planned spaces.

The annex building and the old water reservoir were restored to be reused as support structures for the museum. A souvenir shop, resource center, seminar hall with pantry, and sleeping quarters for staff was accommodated in these areas.

The museum was opened on 11 February 2019.

Photos:
The main entrance before restoration

The main entrance during restoration work

The main entrance after restoration

The historical marker recognizing the national significance of the property was unveiled during the museum opening.

Conservation of the Old Antique Provincial Capitol

Project: Conservation of the Old Antique Provincial Capitol
Location: San Jose, Antique
Cultural property owner: Provincial Government of Antique
GAA Budget: P30,000,000.00
Fiscal year: 2018
Date started: No data
Target date of completion: No data
Status: Funds transferred to DPWH
Implementing agency: National Historical Commission of the Philippine and DPWH
Contractor: Department of Public Works and Highways (DPWH), Region VI



Restoration of Lazi Convent

Project: Restoration of Lazi Convent
Location: Lazi, Siquijor
Cultural property owner: Diocese of Dumaguete
GAA Budget: P20,000,000.00
Fiscal year: 2016
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippine
Contractor: R.A. Lacanlale Const.
Project documentation:

(29 July 2016)

(13 December 2016)

(14 February 2017)

(29 July 2016)

(13 December 2016)

(14 February 2017)

Conservation, restoration and rehabilitation of Patnongon Ruins

Project: Conservation, restoration and rehabilitation of Patnongon Ruins
Location: Patnongon, Antique
Cultural property owner: Municipal Government of Patnongon
GAA Budget: P15,000,000.00
Fiscal year: 2016
Date started: 20 December 2016
Date completed:The project was not completed
Implementing agency: National Historical Commission of the Philippine
Contractor: J.S. Lim Construction and Trading



Conservation, restoration and rehabilitation of Molo Church

Project: Conservation, restoration and rehabilitation of Molo Church
Location: Molo, Iloilo City
Cultural property owner: City Government of Iloilo
GAA Budget: P20,000,000.00
Fiscal year: 2016
Implementing agency: National Historical Commission of the Philippines
Contractor: Micro Asia
Project description:

The project focused on the cleaning and stabilization of the stone masonry walls, including the two bell towers. Cracks on the walls were repaired. Interior work included the repainting of the walls and repair of the ceiling.

Photos:
Cleaning and stabilization of the walls

Repair of cracks and re-grouting of of walls

Conservation, restoration and rehabilitation of Ker & Co. Building

Project: Conservation, restoration and rehabilitation of Ker & Co. Building
Location: Iloilo City
Cultural property owner: City Government of Iloilo
GAA Budget: P25,000,000.00
Fiscal year: 2016
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippine
Contractor: J.S. Lim Construction and Trading
Project documentation:

Right side of the building (1 April 2017)

Right side of the building (26 August 2017)

Right side of the building (24 July 2018)