Showing posts with label Development projects. Show all posts
Showing posts with label Development projects. Show all posts

Restoration of Punta Diamante including Belfry in Bulusan Sorsogon

Project: Restoration of Punta Diamante including Belfry in Bulusan, Sorsogon
Location: Bulusan, Sorsogon
Cultural property owner: Diocese of Sorsogon
GAA Budget: P10,000,000.00
Fiscal year: 2022
Date started: 2022
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: To be determined
Project description:

Punta Diamante or Bulusan (diamond-shaped) Fortress, approximately 10.13 square meters, in Bulusan, Sorsogon, was constructed in the 18th century with a large triangular murralla (fortification) which encloses the church and rectory of St. James the Great parish complex. The fortress has five (5) watchtowers with high and thick walls made from coral and river stones.

Bulusan used to be a visita of Casiguran before it became a parish in 1630. The first church was made of nipa and wood. In the early 1700’s Father Pedro de Villa Medina directed the construction of the stone church (Huerta, 1875). The stone walls were later added at the 18th century to serve as a defense of towns folks against the incursions of Moro pirates.  The defense of Bulusan against the incursion of Moro pirates led to the meeting of the gobernadorcillo, D. Juan Macsimiano with the principals and cabesaz de barangays in 1799 in an agreement with the Superior Decree issued on the same year (Errecion de Pueblos Albay 1799-1864).

The National Historical Commission of the Philippines (NHCP) on 7 February 2009, unveiled a historical marker for the historic site with the text:

MGA MOOG NG BULUSAN

“Mga moog ng Bulusan itinayo upang depensahan ang mga mamamayan ng Bulusan at ang Punta de Bulusan, na mahalagang daungan para sa mga manlalayag at sa mga barkong galyon sa embocadero mula sa pagsalakay ng mga moro, ika-18 hanggang ika-19 na siglo. Bahagi ng mga istrukturang ito ang mga moog sa macabari, busaingan at gate na ngayo’y sakop na ng mga bayan ng Barcelona, Sta. Magdalena at Bulan, Sorsogon”

One of the tasks of the NHCP is to undertake and prescribe the manner of restoration, conservation, and protection of the country’s historical movable and immovable objects. In line with this, the Commission included in its 2022 locally funded projects the restoration and redevelopment of the Punta Diamante Fort and Bell tower. 

The Diocese of Sorsogon, in coordination with the Local Government of Bulusan and the Provincial Government of Sorsogon requested the National Historical Commission of the Philippines to undertake the restoration and development work in order to preserve and protect this historic site.

The expected output of the project is:

A. Preparation of the as-built plans of the fort complex, ruins and exiting structures within the fort.

B. Detailed Engineering Study with the following essential components:

1. Assessment of the structural integrity of the bell tower through (a) conduct of soil investigation at least two (2) boreholes; (b) structural analysis of a structural engineer with experience in heritage structures; and (c) recommend interventions to strengthen the tower

C. Restoration of the Belfry

1. Mechanical and chemical cleaning, 
2. Consolidation, and strengthening of the unreinforced masonry (injection of lime, repointing, replacement of missing stones)
3. Reinforcement and retrofitting of existing concrete structures
4. Decommissioning of old bells
5. Provision of Digital carillon bells (control to be located at church)
6. Electrical works (up lights)

D. Perimeter walls

1. Mechanical and chemical cleaning, 
2. Consolidation, and stabilization of masonry (injection of lime, repointing, replacement of missing stones)
3. Provision for perimeter lights

E. Site development

1. Cleaning and clearing of site
2. Embankment and landscaping works (softscape and hardscape)
3. Restoration of religious images (grotto, way of the cross and statues)
4. Provision for bollard lights

Photos:
NHCP Photo Collection, 2021

NHCP Photo Collection, 2021

NHCP Photo Collection, 2021

NHCP Photo Collection, 2021

Rehabilitation and Maintenance of National Historical Commission of the Philippines Main and Annex Building including the Rewiring of Electrical System

Project: Rehabilitation and Maintenance of National Historical Commission of the Philippines Main and Annex Building including the Rewiring of Electrical System
Location: T.M. Kalaw Street, Ermita, Manila
Cultural property owner: National Historical Commission of the Philippines
GAA Budget: P30,000,000.00
Fiscal year: 2022
Date started: 2022
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: JS Lim Construction
Project description:

In response to the changing times brought by the Covid-19 pandemic, the NHCP is updrading its workplace focusing on the safety of the employees, information technology and organization of offices. One of the main scope is the recheking and rehabilitation of the electrical system in order to cope up with the amount of equipment and safety gadgets, the Commission will install.

Scope of work of the project:

1.) GENERAL REQUIREMENTS
1.1. Temporary facilities.
1.1.1. Field office Equipment & Maintenance
1.1.2. Office and Communication Equipment for the Field Office
1.2. Provision of form works and rental of steel scaffoldings
1.3. Construction of safety and health requirements.
1.3.1. Installation of drop nets.
1.3.2. Provision of Personal Protective Equipment (PPE) IATF requirements and compliance;
1.3.3. Cordoning and Fencing works
1.3.4. Construction signages
1.4. Photo documentations (Before, during and after)
1.5. Preparation of As-built plans after the rehabilitation (signed and sealed)
1.6. Light, power and water service connection; (toilet and security)
1.7. Bonds and Insurance
1.7.1.1. Surety, Performance, and Warranty Bond
1.7.1.2. Construction All Risk Insurance (CARI)
1.8 Validation of Structural Design
Structural design analysis based in structural design 
(Signed and sealed verification of Structural Engineer)

2.) DISMANTLING WORKS (Partitions, floor finish, ceiling, electrical, toilet, doors, windows, and other components)

3.) PROVISION OF MEZZANINE FLOOR

4.) ARCHITECTURAL WORKS

4.1. Provision of Drywall, and tempered glass with door partitions;

4.2. Tile works
4.2.1. Provision of new floor tiles
4.2.2. Repair and replacement of damaged floor tiles;
4.4 Ceiling works;
4.3 Rehabilitation of staircase, handrails and guard rails;

5.) PAINTING WORKS

5.1 Surface Preparations;
5.2 General painting works;

6.) REHABILITATION OF COMFORT ROOMS

6.1 Realignment of sewer and water lines
6.2 Provision of fixtures
6.3 Tile works
6.4 Ceiling works
6.5 Installation of granite countertop, and wall partitions

7.) REHABILITATION AND PROVISION OF DOORS AND WINDOWS

8.) SUPPLY, FABRICATION, AND INSTALLATION OF ON-GRID SOLAR POWERED SYSTEM

8.1 Supply and delivery;
8.2 Fabrication and installation;
8.3 Pre-final acceptance of the requirements;
8.4 Final acceptance of the solar panel ystem;

9.) ELECTRICAL WORKS

9.1 Installation of new panel boards and feeder lines. Ground floor (GPB1, GPB2), Third and Fourth Floor Distribution Panel (TFDP), Second floor (2PB1, 2PB2), Third floor (3PB1, 3PB2) and Fourth (4PB1, 4PB2); 
9.2 Replacements of conduits and wiring for lighting, power, air conditioning units and elevator. Replacement of conduits plastic moldings for auxiliary wirings (CCTV, telephone fax, Internet and ethernet etc.);
9.3 Replacement of damaged, outdated, busted lightning fixtures and electrical devices;
9.4 Rehabilitation of the main distribution panel;
9.5 Dismantling of old panel boards and feeder lines;
9.6 Installation of new electrical room door for proper ventilation;
9.7 Provision of fire alarm system;

10.) PLUMBING WORKS

10.1 Repair and rehabilitation of roof drains
10.2 Waterproofing of gutters

11.) CLEARING, CLEANING AND HAULING WORKS

Rehabilitation, Improvement and Renovation of Molo Plaza

Project: Rehabilitation, Improvement and Renovation of Molo Plaza 
Location: Molo, Iloilo City
Cultural property owner: Bureau of Customs
GAA Budget: P25,000,000.00
Fiscal year: 2021
Date started: 2021
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: 401 Development Corp.
Description:

The aim of the project is to redevelop historic structures inside the plaza and create a dedicated plaza showcasing the architectural wonder of the facade of the Molo Church.

Photos:





Construction of Nazaria Lagos Monument

Project: Construction of Nazaria Lagos Monument
Location: Dueñas, Iloilo
Cultural property owner: Municipal Government of Dueñas
GAA Budget: P2,000,000.00
Fiscal year: 2018
Date of formal turnover: 13 February 2019
Implementing agency: National Historical Commission of the Philippines
Artist: Julie Lluch
Project description:

The National Historical Commission of the Philippines is mandated to promote, preserve and disseminate information regarding historical events, dates, places and personages.  As part of its mandate to commemorate eminent Filipinos, the NHCP proposed a monument to Nazaria Lagos, a woman leader from Dueñas who helped in the many battles against Spaniards and Americans.  Her exemplary life has become an exceptional model to the local community of Dueñas and the Filipino nation.

Project documentation:
The monument and pedestal dedicated for Nazaria Lagos
Turnover ceremonies held on 13 February 2019.
Turnover ceremonies held on 13 February 2019.

Conservation of Eight (8) Monuments of Filipino Heroes in the Province of Ilocos Sur

Project: Conservation of Eight (8) Monuments of Filipino Heroes in the Province of Ilocos Sur
Location: Province of Ilocos Sur
Cultural property owner: Various local governments
GAA Budget: P8,000,000.00
Fiscal year: 2018
Date started: No data
Date completed: No data
Implementing agency: National Historical Commission of the Philippines
Photos:


Rehabilitation of Local Monuments in San Pablo City

Project: Rehabilitation of Local Monuments in San Pablo City
Location: San Pablo City, Laguna
Cultural property owner: City Government of San Pablo
GAA Budget: P1,000,000.00
Fiscal year: 2018
Date started: No data
Date completed: 2019
Implementing agency: National Historical Commission of the Philippines
Project description:

The project aims to repair, restore and rehabilitate various monuments of local heroes in the city.

Photos:




Rehabilitation of EDSA People Power Monument Complex

Project: Rehabilitation of EDSA People Power Monument Complex
Location: Quezon City
Cultural property owner: National Historical Commission of the Philippines
GAA Budget: P10,000,000.00
Fiscal year: 2020
Date started and completed: 2020
Implementing agency: National Historical Commission of the Philippines
Contractor: Castrillo
Project description:

The existing monument commemorating the victory of the masses in EDSA has been in the state of decay. Its metal structural components were corroded and needed structural interventions. The missing parts of the sculptural work was also restored.

Photos:
EDSA People Power Monument

EDSA People Power Monument

Restoration of Cebu Monuments

Project: Restoration of Cebu Monuments
Location: Bacon, Sorsogon City
Cultural property owner: Diocese of Sorsogon
GAA Budget: P8,000,000.00
Fiscal year: 2020
Date started: 2020
Date completed: 2020
Implementing agency: National Historical Commission of the Philippines
Contractor: No data
Project description:

As part of the Philippine Government’s preparation for the 500th anniversary of the victory of our ancestors led by Lapulapu in the Battle of Mactan, various monuments in Cebu related to the event will be repaired, restored and improved.

Photos:
Antonio Pigafetta Monument in Fort San Pedro, Cebu City

Monument of Cebu Heritage in Cebu City
Rajah Humabon Monument in the Parian District, Cebu City
Rajah Humabon Obelisk at the Parian District, Cebu City
Lapu Lapu Monument in Camp Lapu Lapu, Apas, Cebu
Lapu Lapu Monument in Opon, Mactan, Cebu
Lapu Lapu Monument in Opon, Mactan, Cebu
Magellan's Cross in Plaza Sugbo, Cebu City

Site Development of Lapu Lapu Shrine in Cebu

Project: Site Development of Lapu Lapu Shrine in Cebu
Location: Mactan, Cebu
Cultural property owner: City Government of Lapu Lapu
GAA Budget: P30,000,000.00
Fiscal year: 2020
Date started: Not yet started
Implementing agency: National Historical Commission of the Philippines
Contractor: To be determined
Status: The proposed budget was realigned to the Bayanihan Act of 2020
Project description:

This development project aims to highlight the monument of Lapu Lapu and the Obelisk of Magellan within a vast local park of the city. The project will also entail a construction of a small exhibition area on the life of the hero, Lapu Lapu and the victory of Mactan over the Spanish colonizers. This project is part of the Philippine Government’s preparation for the 500th anniversary of the victory of our ancestors led by Lapulapu in the Battle of Mactan, and other related events in 1521.

Photos:
The old obelisk dedicated for Magellan
The old obelisk dedicated for Magellan
Monument of Lapu Lapu

Fabrication of Tableau of Aklan Katipuneros depicting the struggles and triumph of the Katipunan revolutionary heroes of Aklan

Project: Fabrication of Tableau of Aklan Katipuneros depicting the struggles and triumph of the Katipunan revolutionary heroes of Aklan
Location: Plaza of the Aklan Provincial Capitol, Kalibo, Aklan
Cultural property owner: Provincial Government of Aklan
GAA Budget: P6,000,000.00
Fiscal year: 2016
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippines
Contractor/Artist: Juan Sajid Imao
Project documentation:








Jesse Robredo Museum (Phase 2)

Project: Jesse Robredo Museum (Phase 2)
Location: Naga City
Cultural property owner: City Government of Naga
GAA Budget: P30,000,000.00
Fiscal year: 2015
Date started: No data
Date completed: 2017
Implementing agency: National Historical Commission of the Philippines
Contractor: C.B. Tampenco Construction and Trading
Project description:

This was the second phase of the construction of the museum dedicated to Philippine statesman, Jesse M. Robredo. The scope of the project were: (1) curatorial development; (2) additional architectural finishes; and (3) site development. The museum was open and unveiled on 18 August 2016, the commemoration of Robredo's death anniversary.

Facade of the museum

Ante-room of the museum

Museum exhibition

Museum exhibition

Museum exhibition

Resin copy of the bronze Robredo statue at the building facade

Wall cladding and landscaping at the left side of the building

Site acquisition and development of the Jose B. Lingad Memorial Park and Monument

Project: Site acquisition and development of the Jose B. Lingad Memorial Park and Monument
Location: Lubao, Pampanga
Cultural property owner: -
GAA Budget: P10,700,000.00
Fiscal year: 2016
Date started: The funds were transferred to the Provincial Government of Pampanga
Date completed: The project has not yet commenced as of September 2018
Implementing agency: National Historical Commission of the Philippines and Provincial Government of Pampanga
Contractor/Artist: Toym Imao (Statue)
Project description:

The project aims to create a monument and park in memory Jose B. Lingad, governor of Pampanga and Philippine statesman.



Installation of Concrete Local Historical Markers on every identified historical sites in San Pablo City

Project: Installation of Concrete Local Historical Markers on every identified historical sites in San Pablo City
Location: San Pablo City, Laguna
Cultural property owner: City Government of San Pablo
GAA Budget: P250,000.00
Fiscal year: 2018
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippines
Contractor:
Project description:

Construction of Monuments of Three Filipino Heroes in Ilocos

Project: Construction of Monuments of Three Filipino Heroes in Ilocos
Location: Candon City
Cultural property owner: City Government of Candon
GAA Budget: P6,000,000.00
Fiscal year: 2018
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippines
Contractor: Juan Sajid Imao





Rehabilitation of Rizal Shrine Dapitan (Phase 2)

Project: Rehabilitation of Rizal Shrine Dapitan
Location: Dapitan City
Cultural property owner: National Historical Commission of the Philippines
GAA Budget: P40,000,000.00
Fiscal year: 2016
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippines
Contractor: J.S. Lim Construction and Trading

Project description:

The rehabilitation work was part of the NHCP's program on the modernization of its history museums nationwide. This second phase of the project mainly focused on site improvement and stabilization of the retaining walls of the area covering the shrine.



Site Development and Rehabilitation of Pinaglabanan Complex including El Deposito

Project: Site Development and Rehabilitation of Pinaglabanan Complex including El Deposito
Location: Dapitan City
Cultural property owner: National Historical Commission of the Philippines
GAA Budget: P130,000,000.00
Fiscal year: 2016
Date started: 15 Jan 2019
Date completed: 3 September 2019
Implementing agency: National Historical Commission of the Philippines
Contractor: J.S. Lim Construction and Trading
Project description:

The rehabilitation work was part of the NHCP's program on the modernization of its history museums nationwide. After the modernization of the Museo ng Katipunan in 2013, this phase of the project was focused on the creation of another museum that presents the setting of the Katipunan events--the El Deposito.

Project documentation:

The newly constructed museum building for the El Deposito (12 June 2018)

Curatorial Work on the Presidential Car Museum

Project: Curatorial Work on the Presidential Car Museum
Location: Quezon City
Cultural property owner: National Historical Commission of the Philippines
GAA Budget: P7,000,000.00
Fiscal year: 2016
Date started:
Date completed:
Implementing agency: National Historical Commission of the Philippines
Contractor: City Neon Philippines, Inc.
Project description: The project was part of the NHCP's program on the modernization of its history museums nationwide. This curatorial development work focused on the interior finishing of the museum such as displays, installations and furnishings. The museum was opened to the public on 19 August 2018, parallel to the 140th birth anniversary celebration of Manuel L. Quezon.
Project documentation:
Official logo of the NHCP's Presidential Car Museum


Media links:

Construction of Laboratory and Classrooms in Bohol and acquisition of laboratory equipment

Project: Construction of Laboratory and Classrooms in Bohol and acquisition of laboratory equipment
Location: Dauis Bohol
Cultural property owner: Bohol Island State University (BISU)
GAA Budget: P25,000,000.00
Fiscal year: 2016
Date started: No data
Date completed: No data
Implementing agency: National Historical Commission of the Philippines
Contractor: Funds for the construction of classrooom building was transferred to BISU; Equipment was procured by the NHCP
Project description:

With the vision to sustain the preservation and development of Bohol's cultural sites and structures, the NHCP embarked on creating a conservation course in cooperation with Bohol Island State University (BISU). Given the vast resources of cultural properties in Bohol, which were restored by NHCP and the National Museum, this course will cover the sustainability of maintaining these sites and structures by producing technical professionals locally. The course will be embedded in the existing technical courses of the university like engineering, industrial arts, and architecture. 

This infrastructure and equipment acquisition project aims to build a permanent building for the course in Dauis, Bohol, the university's off-site campus. The classroom building will have laboratories, classrooms, workshop room and other amenities. Equipment on building diagnostics and material characterization will be furnished in the building.

Curatorial Development of Batanes Museum

Project: Curatorial Development of Batanes Museum
Location: Basco, Batanes
Cultural property owner: Department of Education
GAA Budget: P10,000,000.00
Fiscal year: 2017
Date started: No data
Date completed: 2019
Implementing agency: National Historical Commission of the Philippines
Contractor: Werr Construction
Project description:

This old home economics building will be restored and rehabilitated to be adaptively reused as a culinary museum of Batanes.

Perspective drawing

Before restoration

Ongoing restoration