Project: Rehabilitation and Maintenance of National Historical Commission of the Philippines Main and Annex Building including the Rewiring of Electrical System
Location: T.M. Kalaw Street, Ermita, Manila
Cultural property owner: National Historical Commission of the Philippines
GAA Budget: P30,000,000.00
Fiscal year: 2022
Date started: 2022
Date completed: To be determined
Implementing agency: National Historical Commission of the Philippines
Contractor: JS Lim Construction
Project description:
In response to the changing times brought by the Covid-19 pandemic, the NHCP is updrading its workplace focusing on the safety of the employees, information technology and organization of offices. One of the main scope is the recheking and rehabilitation of the electrical system in order to cope up with the amount of equipment and safety gadgets, the Commission will install.
Scope of work of the project:
1.) GENERAL REQUIREMENTS
1.1. Temporary facilities.
1.1.1. Field office Equipment & Maintenance
1.1.2. Office and Communication Equipment for the Field Office
1.2. Provision of form works and rental of steel scaffoldings
1.3. Construction of safety and health requirements.
1.3.1. Installation of drop nets.
1.3.2. Provision of Personal Protective Equipment (PPE) IATF requirements and compliance;
1.3.3. Cordoning and Fencing works
1.3.4. Construction signages
1.4. Photo documentations (Before, during and after)
1.5. Preparation of As-built plans after the rehabilitation (signed and sealed)
1.6. Light, power and water service connection; (toilet and security)
1.7. Bonds and Insurance
1.7.1.1. Surety, Performance, and Warranty Bond
1.7.1.2. Construction All Risk Insurance (CARI)
1.8 Validation of Structural Design
Structural design analysis based in structural design
(Signed and sealed verification of Structural Engineer)
2.) DISMANTLING WORKS (Partitions, floor finish, ceiling, electrical, toilet, doors, windows, and other components)
3.) PROVISION OF MEZZANINE FLOOR
4.) ARCHITECTURAL WORKS
4.1. Provision of Drywall, and tempered glass with door partitions;
4.2. Tile works
4.2.1. Provision of new floor tiles
4.2.2. Repair and replacement of damaged floor tiles;
4.4 Ceiling works;
4.3 Rehabilitation of staircase, handrails and guard rails;
5.) PAINTING WORKS
5.1 Surface Preparations;
5.2 General painting works;
6.) REHABILITATION OF COMFORT ROOMS
6.1 Realignment of sewer and water lines
6.2 Provision of fixtures
6.3 Tile works
6.4 Ceiling works
6.5 Installation of granite countertop, and wall partitions
7.) REHABILITATION AND PROVISION OF DOORS AND WINDOWS
8.) SUPPLY, FABRICATION, AND INSTALLATION OF ON-GRID SOLAR POWERED SYSTEM
8.1 Supply and delivery;
8.2 Fabrication and installation;
8.3 Pre-final acceptance of the requirements;
8.4 Final acceptance of the solar panel ystem;
9.) ELECTRICAL WORKS
9.1 Installation of new panel boards and feeder lines. Ground floor (GPB1, GPB2), Third and Fourth Floor Distribution Panel (TFDP), Second floor (2PB1, 2PB2), Third floor (3PB1, 3PB2) and Fourth (4PB1, 4PB2);
9.2 Replacements of conduits and wiring for lighting, power, air conditioning units and elevator. Replacement of conduits plastic moldings for auxiliary wirings (CCTV, telephone fax, Internet and ethernet etc.);
9.3 Replacement of damaged, outdated, busted lightning fixtures and electrical devices;
9.4 Rehabilitation of the main distribution panel;
9.5 Dismantling of old panel boards and feeder lines;
9.6 Installation of new electrical room door for proper ventilation;
9.7 Provision of fire alarm system;
10.) PLUMBING WORKS
10.1 Repair and rehabilitation of roof drains
10.2 Waterproofing of gutters
11.) CLEARING, CLEANING AND HAULING WORKS