Showing posts with label Maintenance Works at the El Deposito (2022). Show all posts
Showing posts with label Maintenance Works at the El Deposito (2022). Show all posts

Maintenance Works at the El Deposito (2022)

Project: Maintenance Works at the El Deposito (2022)
Location: Pinaglabanan Memorial Shrine, San Juan City
Cultural property owner: National Historical Commission of the Philippines
GAA Budget: P2,000,000.00
Fiscal year: 2022
Date started: 2022
Date completed: June 2022
Implementing agency: National Historical Commission of the Philippines
Contractor: D.M. Celac
Photos:
Interior of the El Deposito underground tunnel, 2021