Restoration of Paoay Church World Heritage Site (Phase 1)

Project: Restoration of Paoay Church World Heritage Site (Phase 1)
Location: Paoay, Ilocos Norte
Cultural property owner: Diocese of Laoag
GAA Budget: P30,000,000.00
Fiscal year: 2019
Project duration: 270 calendar days
Date started: 2019
Target date of completion: 2020
Implementing agency: National Historical Commission of the Philippines
Contractor: J.S. Lim Construction and Trading
Project description:

The project aims to conservatively repair the material losses in the stone walls of the church. One major structural repair is the access to the bell tower. This conservation work will consider the preservation of the important key Baroque period elements of the church, including its massive buttresses, which form part as the outstanding universal value of the declared World Heritage Site.

Scope of the project:

1.          Mobilization and site preparation
   
1.1.       Temporary facilities/utilities
1.2.       Provision of steel scaffoldings and supports

1.3.       Construction safety and health requirements
1.3.1.    Installation of drop nets
1.3.2.    Provision of Personal Protective Equipment (PPE)
1.3.3.    Cordoning and fencing works
1.3.4.    Construction signage

1.4.       Photo documentation and terminal report

2.          Restoration of church, bell tower and masonry fence
2.1.       Surface preparation
2.1.1.    Mechanical cleaning
2.1.2.    Chemical cleaning
2.1.3.    Systematic dismantling and code marking of loose masonry units for re-installation

2.2.       Masonry consolidation and stabilization of rubble core          
2.2.1.    Injection of lime water
2.2.2.    Re-installation of loose coral blocks and bricks on church facade/rear walls and belfry surface
2.2.3.    Replacement of missing coral blocks and bricks
2.2.4.    Reponting, replastering and lime washing of walls

3.          Restoration of choirloft, pulpit, sacristy and bell tower’s stair
3.1.       Restoration works at existing choir loft and pulpit
3.1.1.    Choirloft
3.1.2.    Pulpit
3.1.3.    Finishing work

3.2.       Restoration of sacristy
3.2.1.    Replacement of deteriorated wooden stair and flooring components
3.2.2.    Restoration of ground floor tiles
3.2.3.    Repointing, replastering and lime washing

3.3.       Rehabilitation of bell tower’s wooden platform and stair

4.          Restoration and repair of doors and windows
4.1.       Restoration/repair of church’s doors, windows and grills
4.2.       Restoration/repair of iron grills in bell tower and perimeter fence

5.          Clearing and cleaning of the construction area

Project documentation:

Before restoration

After restoration

Before restoration

During restoration

After restoration

Before restoration

After restoration